Spencer Holmes Limited was contracted by Memorial Park Alliance to complete high accuracy monitoring of existing buildings, ground levels and the temporary wall piles around the State Highway 1 Arras Tunnel.
A central city townhouse development with an eight storey apartment building,and a two level carpark structure forming the foundation for half of the 30 timber framed townhouses,approx contract value $14M.
The $16.5 million upgrade will not only improve safety by easing a number of tight curves, including Muldoon’s Corner, it will improve visibility, and provide better protection from the drop into the valley.
The work was set out by the survey team, and monitored during construction by the engineering team, and fully signed off by the Wellington City Council to the satisfaction of the Client.
Spencer Holmes Limited provided the structural and civil engineering services to the Waitangi Park development. Waitangi Park required a high level of civil engineering design for an innovative environmental design.
Site surveyors for Harker Underground Construction Ltd who were engaged by the Wellington City Council to lay a new stormwater drain along Wellington’s busy central city streets.
Carl Ashby, an ex-associate of Spencer Holmes Limited, led the company project team which undertook structural and civil engineering design, surveying and resource management planning for the proposed bridge.
Spencer Holmes Limited provided the structural and civil engineering services to the strengthening of the Herd Street post Office building (Chaffers Dock Apartments) and new building known as the Boathouse.
Spencer Holmes Ltd was commissioned by the main contractor LT McGuinness to provide survey set out support for Willis Bond & Co project One Market Lane.